Skip to content
Roadmap0/111
not startedstudy day 2 of 6 · covers original days 87 & 88

Activation Patching Experiment

Circuits & Attribution Limits

not started0/5 blocks
0/5
Jump & context

Week 12: Mechanistic Interpretability Investigation & Public CVE Security Teardowns

The five hours

  1. 01

    Concepts & system design

    60 min

    R34 — TransformerLens Activation Patching & Exploratory Analysis

    R45 — NIST AI 100-2

    Read the assigned sections; map the mechanism, threat model and trade-offs.

  2. 02

    Project implementation

    120 min

    Reproduce a published Activation Patching (causal tracing) experiment on a clean vs. corrupted prompt pair (e.g., Indirect Object Identification). Record the causal intervention, control condition, logit difference metric, and alternative explanations.

    Study introductory circuit analysis and feature attribution. Analyze how causal claims depend heavily on prompt template, corrupt baseline choice, and task definition.

    Build, integrate, debug and improve the increment in the active project.

  3. 03

    Security lab

    60 min

    No separate task text for this block on day 68 — the sourced work sits in the block above. Keep the time box.

    Test the abuse case, failure path, authorization bypass or resource limit.

  4. 04

    Verification & evidence

    30 min

    Reproducible activation-patching notebook + critique of single-head causal claims.

    Add or run regression tests; record the 9-point evidence record.

  5. 05

    Deliberate practice & Socratic review

    30 min

    Answer the 8 Socratic questions without notes: What? Why? How? What if? Why not? How can I prove it? Where can it break? What have I learned?

    Re-explain the hardest concept aloud, inspect one edge case, update the gap log.

  6. total5 h

Read today · inside the concepts block

R34 R45

Read only the named sections needed for today's task. Reading sits inside the 60-minute concepts block; it is not extra time.

Free resources for this day

5 curated

Evidence record · 9-point standard

0/9

A lab is complete only when it produces evidence. Installing PyRIT, Garak, Presidio or TransformerLens is not completion. Saved on this device only.

Day notes

empty

The two source formulations

verbatim · nothing summarised

Project & Stage Target

Research Track | S10

Focus 1 (Activation Patching Experiment — Orig. Day 87)

Reproduce a published Activation Patching (causal tracing) experiment on a clean vs. corrupted prompt pair (e.g., Indirect Object Identification). Record the causal intervention, control condition, logit difference metric, and alternative explanations.

Focus 2 (Circuits & Attribution Limits — Orig. Day 88)

Study introductory circuit analysis and feature attribution. Analyze how causal claims depend heavily on prompt template, corrupt baseline choice, and task definition.

Verification & Evidence

Reproducible activation-patching notebook + critique of single-head causal claims.

Read Today (60m Concepts Block)

R34 (TransformerLens Activation Patching & Exploratory Analysis), R45 (NIST AI 100-2).

---