Skip to content
Roadmap0/111
not startedstudy day 1 of 6 · covers original days 78 & 79

Pixel Auditor, Approval & Takeover

End-to-End Privacy Deletion Propagation

P1 AssistantP2 RAG platformP3 Agent systemM7M9D9C6
not started0/5 blocks
0/5
Jump & context

Week 11: Pixel Auditor Completion, Vector Sleeper Scrubber, Misuse Prevention & Interpretability Start

The five hours

  1. 01

    Concepts & system design

    60 min

    R33 — Playwright screenshots, locators & bounding boxes

    R41 — Agentic approval & takeover

    R17 — NIST Privacy deletion

    R10 — Logging retention

    Read the assigned sections; map the mechanism, threat model and trade-offs.

  2. 02

    Project implementation

    120 min

    Complete D9: before any sensitive click/type action, capture a fresh screenshot, run OCR/visual target inspection, compare visual coordinates against DOM accessibility bounds to detect deceptive overlays/drift, and require parameter-bound human approval or emergency stop/human takeover (C6).

    Test deleting a user's record end-to-end across SQL primary storage, Qdrant/Chroma vector indexes, Redis/in-memory caches, and logs. Document exact deletion guarantees and unavoidable retention limits.

    Build, integrate, debug and improve the increment in the active project.

  3. 03

    Security lab

    60 min

    No separate task text for this block on day 61 — the sourced work sits in the block above. Keep the time box.

    Test the abuse case, failure path, authorization bypass or resource limit.

  4. 04

    Verification & evidence

    30 min

    D9 coordinate-drift/overlay detection and emergency-stop tests + end-to-end cross-store deletion verification test.

    Add or run regression tests; record the 9-point evidence record.

  5. 05

    Deliberate practice & Socratic review

    30 min

    Answer the 8 Socratic questions without notes: What? Why? How? What if? Why not? How can I prove it? Where can it break? What have I learned?

    Re-explain the hardest concept aloud, inspect one edge case, update the gap log.

  6. total5 h

Read today · inside the concepts block

R10 R17 R33 R41

Read only the named sections needed for today's task. Reading sits inside the 60-minute concepts block; it is not extra time.

Free resources for this day

5 curated
  • docsPlaywright · API reference
    Locator | Playwright

    Documents boundingBox() and element screenshots, the API that returns the DOM accessibility geometry you compare against OCR pixel coordinates to detect overlay drift before a sensitive click.

    R33checked 2026-11-11
  • docsNIST · reference
    Privacy Framework | NIST

    Defines Identify-P, Govern-P, Control-P, Communicate-P and Protect-P, the lifecycle controls you cite when writing down deletion guarantees and retention limits for the record-deletion test.

    R17checked 2026-11-11
  • videoDave Ebbelaar · 25 min
    How to Build Human-in-the-Loop for AI Agents (Practical Guide)

    Implements approval gating and pause/resume around sensitive tool actions, the pattern behind parameter-bound human approval and emergency takeover before a destructive click or type.

    R41R10checked 2026-11-11
  • videoPortSwigger · 4 min
    Testing for clickjacking using Burp Suite

    Shows how invisible overlay frames make a user click something other than what they see, the deceptive-overlay class your pixel audit detects by diffing rendered pixels against DOM bounds.

    R10R33checked 2026-11-11
  • articleTian Pan · ~12 min read
    The User You Can't Delete: Right to Be Forgotten in AI Systems

    Traces how one person's data spreads across weights, vector indexes, caches and logs, which is the map you follow when testing end-to-end deletion and documenting what cannot be erased.

    R17checked 2026-11-11

Evidence record · 9-point standard

0/9

A lab is complete only when it produces evidence. Installing PyRIT, Garak, Presidio or TransformerLens is not completion. Saved on this device only.

Day notes

empty

The two source formulations

verbatim · nothing summarised

Project & Deliverable Target

P3 (`D9` Pixel Auditor, C6) & All Projects (M7) | M9, M7

Focus 1 (Pixel Auditor, Approval & Takeover — Orig. Day 78)

Complete D9: before any sensitive click/type action, capture a fresh screenshot, run OCR/visual target inspection, compare visual coordinates against DOM accessibility bounds to detect deceptive overlays/drift, and require parameter-bound human approval or emergency stop/human takeover (C6).

Focus 2 (End-to-End Privacy Deletion Propagation — Orig. Day 79)

Test deleting a user's record end-to-end across SQL primary storage, Qdrant/Chroma vector indexes, Redis/in-memory caches, and logs. Document exact deletion guarantees and unavoidable retention limits.

Verification & Evidence

D9 coordinate-drift/overlay detection and emergency-stop tests + end-to-end cross-store deletion verification test.

Read Today (60m Concepts Block)

R33 (Playwright screenshots, locators & bounding boxes), R41 (Agentic approval & takeover), R17 (NIST Privacy deletion), R10 (Logging retention).

---